Simple Failover

Dp Dual Trac 20 Assembly Manual Jun 2026

Look for fraying or "kinks" in the plastic coating. Replace cables immediately if the steel core is exposed.

Do not fully tighten these bolts until the upright support beams are in place to ensure the frame is perfectly square. 2. Upright Supports and Dual Tracks

Periodically apply a silicone-based lubricant to the weight guide rods to ensure smooth travel. Dp Dual Trac 20 Assembly Manual

The base frame provides the structural foundation for the entire machine. Lay the flat on the floor.

Which is causing confusion? (e.g., the floating pulley, the seat assembly, or a specific cable) Look for fraying or "kinks" in the plastic coating

Double-check that all cables sit directly inside the center groove of every single pulley wheel.

If you have landed on this page, you are likely the proud owner—or soon-to-be owner—of a , a robust piece of machinery known for its dual-tracking capabilities in woodworking, metal fabrication, or specialized material handling. However, like any precision tool, its performance hinges entirely on correct initial assembly. Lay the flat on the floor

Sweat is corrosive. Wipe the vinyl pads and steel frame after every session.

Then came the "Dual Trac" mechanism—the heart of the machine. Arthur carefully aligned the nylon pulleys, threading the high-tension cables with the focus of a surgeon. One wrong loop and the whole system would grind to a halt. He could see the logic of the design now: the way the bench would glide, the way the resistance would distribute.

Simple Failover

  • Home
  • Product details

  • Features
  • Sample scenarios
  • Screen shots
  • Compare licenses
  • Download

  • Download
  • Buy

  • Pricing
  • New license
  • Upgrade
  • Support

  • Overview
  • Lost License Key
  • Knowledge Base
  • Online documentation
  • Contact us
  • Recent