Tower Crane Dismantling Method Statement -
100% fall protection is required for all workers at height.
Highly specialized technicians who physically unbolt, unpin, and separate the structural sections of the tower crane. 3. Required Machinery, Tools, and Equipment
Set up a clearly defined exclusion zone around the entire dismantling area. This zone should be cordoned off with barriers and warning signs. No unauthorized personnel should be permitted within this area at any time during dismantling operations. tower crane dismantling method statement
Oversees the entire operation, ensures structural readiness, and coordinates site logistics.
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later. 100% fall protection is required for all workers at height
The assist crane is rigged to lift a portion of the counter-weights.
From a legal standpoint, all work must be conducted in strict accordance with the manufacturer's written instructions. If these are not available, the procedure must follow recognized consensus standards, such as ASME B30.3, and local regulations like OSHA 1926 Subpart CC in the US. All safety devices on the crane must have been calibrated within a specified period (e.g., the preceding three months) before the dismantling begins. Required Machinery, Tools, and Equipment Set up a
The mobile crane operator will hold the load steady or lower it to the nearest safe structural surface if possible.
The dismantling work will be carried out in the following sequence:
Construction authorities and health and safety regulators mandate the use of method statements for high-risk activities.